Drywall Installation Rockville, MD: Basements, Additions and Remodels

Finishing a basement or adding a room means new walls that need to look right the first time. We handle sheetrock installation from the first sheet to the final primed coat, with the right board for each room. Serving King Farm, Twinbrook, Fallsgrove and all of Rockville, planned around your permit inspections.

📞 Call (227) 250-0050 Get a Free Estimate
  • Free Walkthrough
  • Fixed Written Price
  • Right Board Per Room
  • Primed for Paint

Rockville’s Hang-and-Finish Crew, Not a Framing-Only Outfit

New walls for a finished basement, an addition or a remodel, hung straight and finished smooth. We handle the board, the taping and the finish, and we leave the room primed for your paint.

Full sheets go up wherever possible, so there are fewer seams to hide. Screws go into every stud and joist.

Beyond repairs, new walls are part of our professional drywall service in Rockville.

Choosing the Right Board for Each Room

1/2 inch standard board

The everyday choice for bedroom, hallway and living room walls.

Sag-resistant ceiling board

Stiffer half-inch board that stays flat between ceiling joists, even under blown-in insulation.

5/8 inch Type X

Fire-rated board for garage walls and ceilings under rooms above a garage.

Moisture-resistant board

For basements and laundry rooms, where the air stays damp for part of the year.

Mold-resistant board

Fiberglass-faced board for bathrooms and basements with a history of leaks.

Cement board

Goes behind tile in showers and tub surrounds, and won’t break down when wet.

The wrong board is a common reason new walls fail early, like standard board behind a shower.

Who We Help

  • Homeowners finishing a basement in a King Farm town home
  • Families adding a room onto a 1950s Twinbrook ranch
  • Owners framing a home office into the lower level of a three-level colonial
  • Landlords splitting a large room into two
  • Remodelers who need walls closed up after new wiring or plumbing

Permits in Rockville and Montgomery County

New framing and drywall, like a finished basement, usually needs a building permit and an insulation inspection before the walls close. Where you apply depends on your address.

Check with the permit office for your exact project before the work starts.

Installation Projects We Take On

New drywall goes up for many reasons. These are the installation jobs we see most across Rockville and nearby Montgomery County.

Basement Drywall Installation

Finishing a basement is the most common installation job in Rockville. We hang moisture-resistant board, leave a small gap at the floor so the bottom edge stays dry, and finish the walls smooth. Outside walls usually get insulation first, which has to pass inspection before the board goes up.

Ceiling Drywall Installation

Ceilings take sag-resistant half-inch board or 5/8 inch board, screwed to every joist. We use a drywall lift for full sheets overhead so seams land where they should. Repairs to existing ceilings are covered on our ceiling repair page.

Drywall Partition Walls

Splitting a large room into two, adding a home office or closing off a laundry area all need a partition wall. Once the framing is up, we hang, tape and finish both sides so the new wall matches the rest of the room.

Insulation and Drywall Installation

Outside walls and walls around bathrooms often get insulation for heat or sound before drywall goes on. We plan the drywall schedule around the insulation inspection so walls aren’t closed too early.

Additions and New Construction Drywall

Room additions, sunrooms and new builds need full drywall packages: board, corner bead, tape and finish. We work with your builder’s schedule and finish to the level your paint needs.

Corner Bead Installation

Every outside corner in a new room gets corner bead. Paper-faced bead resists cracking, and vinyl suits damp rooms. Straight corners are what make new walls look sharp. Damaged corners in existing walls go through corner bead repair.

Drywall Repair and Installation in One Job

Remodels often mean new walls in one room and fixes in the next. We handle both in one visit: new board where it’s needed, hole patching where it isn’t, and a matched finish throughout. For offices and shops, see our commercial drywall page.

Our 5-Step Drywall Installation Process

  1. Walkthrough and quote

    We measure the space, check the framing and give you a fixed price in writing.

  2. Hang the board

    Full sheets where possible, screwed into every stud or joist.

  3. Tape and corner bead

    Corner bead on outside corners and tape on every seam.

  4. Finish coats

    Three thin coats of compound, with drying time between them.

  5. Sand and prime

    Vacuum sanders keep the dust down, and we finish to the level your paint needs.

What’s included in a drywall installation job?

Board, screws, tape, corner bead, compound coats, sanding, primer and cleanup. Framing changes and permits are discussed during the walkthrough.

Want the full picture, from the first call to cleanup? Read how we work.

  • Right Board Per Room
  • Full Sheets, Fewer Seams
  • Level 4 or Level 5 Finish
  • Primed for Paint

How Smooth Should the Finish Be?

  • Level 4 is the normal finish for painted walls
  • Level 5 adds a skim coat over the whole surface
  • Level 5 suits glossy or dark paint and walls lit from the side
  • Full breakdown: National Gypsum guide to finish levels
  • Most Rockville homes need Level 4

We suggest Level 5 for big open walls beside windows, or when you plan a satin or glossy paint.

How we work: Shield Drywall Rockville connects your job with a local drywall professional who does the on-site work. You get a written, fixed price before anything starts, and the work follows the process on this page. About Shield Drywall Rockville.

Installation Answers

Do I need a permit to finish my basement?

Usually, yes. A finished basement with new framing and drywall needs a building permit. Inside city limits, apply through the City of Rockville. Outside the city, it goes through Montgomery County DPS.

How long does it take to hang and finish a room?

Hanging a standard room takes about a day. Taping, three coats of compound and sanding add 2 to 4 more days, because each coat has to dry.

Got Questions About Installation?

Which drywall goes in bathrooms and basements?

Moisture-resistant or mold-resistant board goes in bathrooms, laundry rooms and damp basements. Behind tile in a shower, cement board is the better choice.

What thickness do you use for ceilings?

Half-inch sag-resistant board or 5/8 inch board, which stays flat between the joists.

Can you install drywall around new insulation?

Yes. Once the insulation passes inspection, we hang the board right over it. In basements, we keep a small gap at the floor.

Do you finish the drywall too, or only hang it?

Both. We hang, tape, apply the compound coats, sand and prime, so the room is ready for paint.

Can you close up walls after an electrician or plumber?

Yes. We patch or replace the opened sections and finish them to match the wall around them.

Do you install drywall in new construction?

Yes. We hang, tape and finish drywall for room additions, new builds and full remodels, working around your builder’s schedule and inspections.

Can you put up a wall to split a room?

Yes. Once the framing is in place, we hang and finish both sides of the new partition wall so it matches the room.

More answers are on our drywall FAQ page.

If the finished texture shows once the wall is painted, we come back and redo it.

Planning New Walls?

Tell us about the room and we’ll give you a fixed price after a free walkthrough.

📞 Call (227) 250-0050 Get a Free Estimate